May19, 2012
Honorable Prime Minister,
Dr. Manmohan Singh,
South Block, New Delhi 110011
cc. Honorable Minister of Water Resources,
Shri Pawan Kumar Bansal,
‘Experts Water Cell in PMO’
CORRUPTION, LOOT, WASTE OF
WATER RESOURCES IMPACT
Ministries of 1. Water
Resources, 2. Agriculture, 3. Environment, 4. Power, 5. Rural-Urban
Development, 6. Health, 7. Industries, 8. MNRE, + PMO, Finance Minister, and
Planning Commission.
Respected Sir,
This Inventor is Writing to
PMO on Water, Power, Technologies, Transport, Agriculture, Innovative Projects
since 1980 but THOUSANDS OF PETITIONS MADE LITTLE IMPACT, CONDITIONS HAD
WORSENED IN REAL TERMS. Acknowledgments of 1980s as 4 attached for Example -
1. Bogus R&D – NRDC
awarding bogus inventions 1980 – CSIR-DSIR files BOGUS PATENTS and wasting $1b
annually worth $5b in PPP term today.
2. Water Supply 1980 – over
designed inefficient poor quality water supply
3. Garland Canal
shelved in 1980 by smt Indira Gandhi revived as River Link in 2002.’ – Water sector development is Crippled since
NDA rule.
Hundreds of Petitions To PMO are ‘Consigned to Waste
Basket’
Rs.8000 Cr.+ Rs.20,000 Cr. Ken-Betwa Link -
Bundelkhand Loot
For example: - Rs.8000
Crores Bundelkhand Package Since 2006 Had Made NO IMPACT In The Absence of
Storage Dams. Ken-Betwa Link may cost Rs.20,000
crores in 40 years when INNOVATIVE
Daudhan Storage Dam on Ken River could be built for Rs.1000 crores in 12 months
Irrigating 4-6 Districts in Bundelkhand. THUS THERE IS TOTAL LOOT & NO PROGRESS IN BUNDELKHAND EVEN WHEN
CENTRAL GOVERNMENT IS FUNDING IT.
Vidharbha Package too failed in absence of IRRIGATION
PROJECTS.
In latest petition enclosed I explained How MP shall
control 95% of Ken Betwa Waters when both UP & MP have identical 1.8 mhac
cultivable area.
CWC, NWDA – Mislead GOI and Hide Inefficiency,
Corruption and Waste – It Is
Impossible For PMO to Access Correct Information. This inventor instantly comes
to know All Their Mischief – It takes hundreds of hours to ‘Unearth HIDDEN Evidence’
like in the case of petition ‘Lame Duck
Hydro Power Projects in HP, J&K & UK(C) April14, 2012’
Prime Minister Urgently Need ‘Experts Water Cell in
PMO’ to accelerate ‘Water Projects Development’
Inefficient and Uneconomical
and Wasteful management of WATER RESOURCES impacts Eight Ministries directly,
PMO, FM, PC cumulatively.
It is obvious Water Is Most
Critical for all human activities – India need to Store Water for Power
Generation, Flood Control, Irrigation and Municipal Supplies plus more benefits
and inadequate and Contaminated water IMPACTS Agriculture, Environment, Power,
Rural-Urban Development, Health, Industries, MNRE, Poverty Eradication and PM,
FM, and Planning Commission are Cumulatively Impacted.
1. Ministry of Water
Resources: – India
to Have 500 BCM Live Storage, Minimum 30% of Basin Flows Storage, 30 Million
Hectares Flood Protection.
2. Ministry Agriculture: -
Agricultural Production could go up Up to 100% from increase in crop yields and
increase in Double Cropping area.
3. Environment: - Flows in
rivers in post monsoon months could go up 10 times or more. For example: With
dams built on Upper Yamuna, flows in River Could go up from 300 cusecs to 1000
cusecs to even 2000 cusecs. There shall be substantial gain in growth of
forests, flora and fauna.
4. Power: - Hydro Power
potential in India and Himalaya is 200,000 MW.
5. Rural-Urban Development:
- Water is essential for Sanitation, Water Supply, Agriculture, Agro Industries
etc.
6. Health: - 50% to 60% of
disease burden in India
is due to ‘Poor Quality of Water’ – even Cattle need good quality water for
Milk Production.
7. Industries: - All
industries need water – from Hotels to Steel Plant.
8. MNRE: - Hydro Power is
the biggest source of ‘Renewable Energy.’
Functions of the Experts
Water Cell in PMO
AR2011 Water Resources Karnataka. ‘There are 125
Major and Medium Irrigation Projects in the State, out of which 48 projects are
completed, 77 are ongoing.’ Some Critical Projects, under implementation for
20-50 years are total waste of resources CRIPPLING OUR ECONOMY.
Experts Water Cell
Consisting of 4-5 Staff shall ‘Make GOI
Data Usable By Civil Servants’ and Remove
Hindrances in Implementing Critical Water Projects. Promote Multipurpose
Projects that can be Commissioned in 12-24 months, Double Income of Poorest in
Short Time. Match water projects with ongoing Poverty Alleviation Programs.
a.] Fast installation of
Multipurpose Projects to Full Potential.
b.] Resolve Conflicts between
States and Countries to ensure Optimum Use of River Waters.
c.] Access and distribute real time data of Water
Releases and Storages for Optimum Irrigation & Flood Protection. Make
maximum use of existing Live and at times of Dead Storage.
d.] Identify and prevent
waste of water resources.
e.] Develop Water
Technologies for Efficient and Economical Storages and Conveyance of water.
f.] Fast hydro power
development.
g.] Real Assessment of
Environment Impact of Projects – causes of delays and confusion.
h.] Prepare ‘Annual Report
of Water Projects on Standards Format.’
Thank you,
Faithfully
Ravinder Singh*
Inventor & Consultant
INNOVATIVE
TECHNONLOGIES AND PROJECTS
Y-77, Hauz Khas, New
Delhi-110016, India.
No comments:
Post a Comment